Mission critical equipment, forged by experience.

The success of your business hinges on having the right equipment. We use decades of experience and industry relationships to acquire the data center equipment you need without supply chain delays.

// Beyond Equipment Supply

Integrated from day one.

We supply equipment and deliver a complete, integrated solution that ensures every component works together seamlessly from day one. Our approach eliminates the coordination gaps that arise when equipment procurement, engineering, and installation are handled by separate teams.

The success of your business hinges on having the right equipment at the right time. Acquiring data center equipment can be difficult due to supply chain issues or finding specific equipment that your operator, tenant, or customer needs.

We understand all the components that go into creating value for your business and use our relationships to acquire the equipment you need without supply chain delays.

Mission-critical data center electrical and infrastructure equipment installed and integrated on site
// The Partnership

Exclusive distribution.

hi-tequity serves as an exclusive distributor for Global Power and Mechanical Solutions leaders. // Manufacturer disclosed under NDA on engagement.

UPS & CDU racks

Premier provider of critical UPS, CDU racks, and other essential data center infrastructure components.

GPU / AI chipset electronics

Electronics that support the full range of GPU and AI chipsets, from NVIDIA and AMD to Cerebras and the hyperscaler silicon coming behind them.

AI complexity mitigation

Technology that addresses the complexity generated by AI workloads, preventing negative impacts on infrastructure, switchgear, and breakers upstream of those demanding loads.

// How We Deliver

A flexible, integrated
infrastructure partner.

A strategic, value-added infrastructure partner aligning engineering expertise, supply chain access, and commercial flexibility to accelerate deployment and improve delivery certainty.

Accelerated Equipment Procurement

  • Established OEM relationships and allocation priority
  • Early production slot reservations and manufacturing visibility
  • Supply chain management across long-lead components
  • Reduced exposure to supply chain volatility

Program-Level Project Management

  • Dedicated program management from design through commissioning
  • Vendor coordination across all electrical and mechanical disciplines
  • Schedule compression through parallel execution
  • Proactive risk tracking and mitigation

Deep Engineering Support

  • Early-stage design collaboration and value engineering
  • Integration across electrical and mechanical infrastructure
  • Utility coordination and technical interface management
  • Standardized yet customizable architecture

Commercial Flexibility That Enables Deployment

  • Flexible commercial structures tailored to capital strategy
  • Equipment purchase with structured terms
  • Alignment with phased deployment and revenue staging
  • Competitive cost structure and milestone alignment
// Delivery Certainty

Racks ready, on schedule.

The difference between an industry-standard timeline and ours comes down to secured allocation and parallel execution. Equipment arrives staged and integration-ready, not stranded in a backlog.

That is what lets a 100 MW build land in roughly nine months instead of two-to-three years: the hardware is reserved, tracked, and delivered as one program.

Technician integrating breaker and switchgear equipment on site, staged for deployment
// FAQ

Common questions.

Draft answers from the equipment team. Tell us your spec for specifics.
How fast can you deliver critical equipment?

We deliver complete infrastructure for a 100 MW data center in roughly 9 months, versus an industry standard of 2 to 3.5 years. Utility-grade transformers arrive in under 8 months, versus an industry standard of 36 months, with an additional 25 MW available every quarter after initial deployment.

Do you actually hold manufacturing capacity, or just broker it?

We hold secured production capacity and delivery slots with top-tier manufacturers, including exclusive distribution agreements with Global Power and Mechanical Solutions leaders. That access is reserved before clients need it, not sourced reactively once backlogs hit.

Which equipment do you cover?

The full electrical and mechanical package. On the electrical side: HV switch, substation transformers, MV switchgear, diesel and natural gas generators, pad-mount transformers, UPS, LV switchgear, PDUs, and RPPs. On the mechanical side: CDUs, CRAHs, air handlers, chillers, dry coolers, cooling towers, pumps, and thermal storage. We own it from procurement through delivery and handover, not just sourcing.

Do you replace our contractors and engineers?

No. We complement your contracting and engineering partners. We integrate components into functioning systems, coordinate equipment startups, and prepare facilities for third-party commissioning rather than performing primary contracting ourselves.

How do you structure commercial terms?

Flexible structures aligned to your capital strategy: equipment purchase with structured terms, alignment with phased deployment and revenue staging, and a competitive cost structure with milestone-based alignment.

Send us your spec.

A short call with the equipment team. We will come back with what is realistic to source and on what kind of timeline.